How we re-engineered crane safety for a major steelworks

25 years of eliminating operator fatigue and safety risks with Spohn & BurkhardtAt AS Controls, we have the experience and knowledge to understand what is required from a joystick, whatever the conditions or wherever they are fitted, which can be as diverse as an air-conditioned control room to the harsh environment of a steelworks.To illustrate [ … read more ]

EFW Control Chair Installation

Case Study:Ergonomic Assessment of Waste Crane Operator Chairs in LincolnshireInstallation Date: March 2024 | EFW facilityThe Objective:The objective was to design and manufacture two waste crane operator control chairs for turnkey installation.A leading waste management facility identified a need to improve the working conditions of their crane operators. The new chairs were specified to include [ … read more ]

Case Study: Cable Track at a Steel Works

Date of install: November 2023  |  Where: Steel Works Product:  As a part of this project we successfully installed a cable track system covering a 31-meter travel, The first of its kind in the UK. This innovative and robust technology offers significant benefits to our customers. The purpose of our cable track system is to increase [ … read more ]