Case Study:Ergonomic Assessment of Waste Crane Operator Chairs in LincolnshireInstallation Date: March 2024 | EFW facilityThe Objective:The objective was to design and manufacture two waste crane operator control chairs for turnkey installation.A leading waste management facility identified a need to improve the working conditions of their crane operators. The new chairs were specified to include [ … read more ]

